Pro-Light  |  92525

3-phases installation side feed-in protective conductor on the left black

14,98 € RRP 18,50 €
VAT included. Shipment is calculated in the checkout.
Delivery time approx. 5-7 days
60 days
Return
Excellent
service
Flexible
payment
Testimonial 1 Testimonial 2 Testimonial 3

Recommend Sophie, Maximilian and 1.1 million satisfied customers skapetze® further.

Description

Feed on the left for the installation variant of our 3-phases of the power rail.

Product details

Reviews

3-Phasen Einbau Seiten-Einspeisung Schutzleiter links Schwarz  Pro-Light
Pro-Light

3-phases installation side feed-in protective conductor on the left black

14,98 € RRP 18,50 €

Feed on the left for the installation variant of our 3-phases of the power rail.

Show product